Demo/ Irrigation/ Installs/ Mulch - EVOLVING
Customer: David Schroeder (Stratton Project)
Address: 1010 Lake Diaz Cemetery Road (DeLeon Springs, FL)
Crew:
(DM) Eric Moore
(CM) Colby Keith
(CM) Christian Myers
SCOPE:
(Prep) DAY 1
Removal of all plants, sod, and mulch as signified on landscape plan. within the Phase 1 specs.
Level beds for planting -Dump fees associated
*Leave Bird of paradise and Sago palm that is closest to front door (see landscape plan)
(Irrigation) - Stock/ Site One
Pop up shrub heads with NP rotator nozzles to irrigate plants installed in phase 1 -Includes timer adjustment and inspection 1 month after install (on schedule for August 10 performed by Nathan)
(Drainage) - Site One (Orange City)
Drainage ran for 4 downspouts
(2) on north side of walkway ran out of bed
(2) on south side of walkway ran under sidewalk into yard
1 roll SOLID 4' corrugated
4 DS adapters
4 pop up emitters
Second half of this project is on hold due to weed treatment that needs to take place before plantings
(Plant install) Day 2 - TBD currently on hold until Treatment is completed
Installation and materials for all plants outlined for phase 1 package below
(Mulch) - West Volusia Shed on Hold
Installation of 16.5 yds brown shredded
(Delivery) - TBD
Pick up of plants and materials
(Notes)
Stratton
Equipment:
V10, Sure Trac with rails
Mini Skid
Backpack Blower
Stakes (Purchase 2 boxes if needed)