Upcoming Events.
Ewen’s Outdoors
Retaining Wall Dismantle and Rebuild
Customer: Ewen’s Outdoors (1620)
Phone:
Address: (DeLand, FL)
Crew:
(LF2) Bob Nichols - Procurement
(LF2) Ethan Yorio- Field Project Manager
(MF) Eric Moore- Master Foreman
(CM2) Jonathan Howell
SCOPE:
(Removal)
Remove existing wall with the intent to re use the wall blocks on wall extension.
If wall does not come apart well due to glue there will be a need for more blocks.
(Notes)
Ewen's Outdoor to handle grade and cut out for wall
All utilities, drainage, ac units etc. are to be marked or moved prior to installationWall will not have matching caps (can remove existing caps to make uniform) TBD by Camren on day 1 of project.
(Retaining wall)
Install tiered retaining wall with matching blocks from existing wall approx. 35 ft stepping down to match grade
Equipment:
7.3 L/ Sure Trac
Mini Skid
V10/ U-Dump
Wheel Barrells
Blower
Shovels
Heather Kountanis
Site Spruce Up
Customer: Heather Kountanis (1697) Current Customer
Phone: (352) 636-4896
Address: 125 Asterbrook Dr. (DeLand, FL) Victoria Hills
Crew:
(LF3) Ethan Yorio: Project Manager
(MF) Eric Moore
(CM2) David Gilliliand
(CM2) Maurice Simpson
SCOPE:
(Irrigation) Nathan COMPLETE
Full system irrigation inspection & report (zone map, components outline and estimate on repairs/adjustments needed)
All Repairs Completed
(Cleanup)
Cut back Ligustrum hedge to window level
Trim schillings into globes
Trim Indian Hawthorne into lower globes
Remove jasmine inside of blue line
Remove any and all Virginia creeper or other vines
Remove rubber mulch
(Soil)
Amend front of bed where rubber mulch is currently with 1/2 yd of garden soil & fertilizer
Sprinkle preen (pre emergent) into area to prevent weeds
Crew will not be able to keep weeds out of flower area with herbicide, some hand weeding and pre emergent will need to be performed by homeowner.
(Plant install)
Install 2 trays of annuals into front part of bed (where rubber mulch is)
Based on timing of approval will dictate the flowers available at the nursery.
(Irrigation) To Be Handled by Enhancement Crew (David or Eric)
Re install drip line to cover all newly installed flowers
Equipment:
7.3L (Eric)
U-Dump (Ethan)
V10 (Ethan)
Wheel Barrels
Irrigation Boxes
Jennifer Dickinson
LANDSCAPE SITE CONSTRUCTION
Customer: Jennifer Dickinson (1672) Current Customer
Phone: (561) 319-1665
Address: 2757 Red Wing Village (DeLand, FL)
Crew:
(LF3) Ethan Yorio: Project Manager
(MF) Eric Moore
(CM2) David Gilliliand
(CM2) Maurice Simpson
SCOPE:
MONDAY:
Site meeting with Camren 8:00 AM.
Ethan this project procurement will be completed by you by COB (close of business) Monday I have sent you access to an excel sheet that you can utilize as I do for your previous project procurement sheets.. Starting with this project you will now take over handling procurement on projects. Once the site walk has been completed you will hand off project to Foreman of your choosing for demo and preparation work, ensure they have knowledge of full scope of work.
Head to office utilizing my computer and complete this projects full procurement scheduling. Schedule all pick ups within the week within a timely manner with all vendors within our network. Utilize previous project procurement schedules for addresses and vendor selections.
If you have any questions shoot me a text I will be on irrigation jobs from 9 AM - 4 Pm today.
Good luck.
(Irrigation) Nathan & Eric COMPLETE
Installation of 2 zone system utilizing MP Rotors. Head adjustments needed prior to project completion
Eric to delete 1 head by pool enclosure RH entry and add 5 heads to front beds left by stub up by nate.
(Sod Removal)
Remove all weeds (sod) around property
Remove all plants/beds in front of home (leave Hibiscus)
(Sod Install)
Install (15) pallets of Seville St. Augustine (shade tolerant)
(Plant install)
(Front bed)
(1) 30 gallon Holly
(8) 3 gallon Trinnette (variegated arbicola)
(6) 3 gallon maime crotons
(6) 3 gallon Hawaiian Ti's
(Front door beds)
(1) 30 gallon holly
(3) 3 gallon Hibiscus
(8) 3 gallon trinette
(10) 1 gal Blue daze
(Pool screen bed)
(1) 3 gallon elephant ear
(60) 1 gallon white African iris
(Fire pit beds)
(12) 1 gallon liriope
(1) 30 gallon Thuja green giant
(West side of home)
(12) 3 gallon split leaf philodendron
(Backyard center tree)
(1) Golden Pathos
**All plants come with 1 year warranty and are installed with fertilizer lasting up to 1 year after
(Rock)
Install (10) yards of DOT#4 for boat parking and down eastern side of DW (Thick)
(Rock)
Install (4) yards of slate chips to walkway and fire pit area
(Edging)
Install black proloc aluminum edging to all landscape beds & walkways
(Landscape Fabric)
Install landscape fabric under all rocked areas (1 Roll)
(Mulch)
Install (10) yards of brown shredded mulch to all landscape beds
(Flagstone)
Flag stone steps (walkway) from boat parking to pool screen & firepit
**Material is priced per pound so estimate cannot be absolute until purchasing. Budget? Estimated for material to run $260-$500. Price is for labor to install on paver base only, does not include material.
(Firepit) Fence line to be flagged by homeowner weekend prior to commencement.
Create a medium size fire pit out of boulders in corner of property (1-2 ft deep saucer)
Place boulders in wet concrete to lock them into place
**Material is priced per pound, will not know material cost until weighing individual stones. Price is for labor only
(Pavers)
(180 sqft.) Widen driveway on western side (60x3)
** If paver choice matches one that we currently have at the shop I will give you the extra pavers to keep from purchasing an additional pallet. Paver pallets run about 120sf.
(Downspouts)
Install French drain into "swamp" from downspout on pool screen
(Rail Ties) 17 TOTAL
Install rail ties on outer edge of boat parking area to keep all rocks within "bed" (10 ties) with 2 pieces of rebar to lock them in
+(7 rail ties) for eastern side of driveway changed from sod to rock
Equipment:
7.3L (Eric)
U-Dump (Ethan)
DOVETAIL
BIGSKID
MINI SKID
RAILS
V10 (Ethan)
Wheel Barrels
Irrigation Boxes
AJ Roman (AID)
Palm Tree Installation
Customer: AJ ROMAN (AID)
Phone: (386) 589-9689
Address: 296 Jackson Loop (DeLand, FL)
Crew:
(MF) Eric Moore
SCOPE:
(Palm Tree Installation)
Utilizing Big Skid Assist Roman Property Services with Palm Tree Installation, drop off big skid at site and unload when finished, grease clean and continue day with Enhancement Div on Site.
Should only take approx: 2-3 Hrs. in the morning when first arriving to work.
Equipment:
7.3 L
Skid Steer
Dovetail
Ken Shraiberg
Site Clean Up, Demo, Sod, Irrigation, Plantings
Customer: Ken Shraiberg (1653) New Customer
Phone: (847) 338-0842
Address: 17624 Live Oak dr. (Deer Island | Tavares, FL)
Crew:
(LF3) Ethan Yorio: Project Manager
(MF) Eric Moore
(CM2) David Gilliliand
(CM2) Maurice Simpson
SCOPE:
(Irrigation) Nathan COMPLETED
Full system irrigation inspection & report (zone map, components outline and estimate on repairs/adjustments needed)
Perform all repairs to system included in Estimate #1687 ($705.84)
(Removal)
Remove "weeds" and ground cover on both sides of paver driveway, haul to waste transfer station.
Prep/grade for sod installation (ensure swale remains intact and proper)
(Tree stake) Truck and or Site One if none left over from Jacksonville
Stake olive tree straight with (3) Abor ties
(Sod Install) Pick Up (Thursday Morning) R&R Sod NSB, FL
Install (4) pallets of Florotam St. Augustine (1,600sf)
PICK UP: R&R Sod Farm (NSB, FL) THURDAY MORNING use dovetail trailer
PICK UP PYGMY DATE THE SAME DAY USING 6.2 L F250 BED.
May be a hair short of completing the entire yard, if so client will make the "walkway" larger with mulch to reduce cost of additional pallet). No farms sell pallets at 450sf in our area (currently)
(Plant installs) PICK UP THURSDAY MORNING
(1) 30 gallon Tri trunk pygmy date palm (Costal Botanics)
(5) 3 gallon Dwarf fakatcahe grasses (native) (County Line)
(4) 1 gallon liriope (2 super blue & 2 variegated) (County Line)
All plants are installed with slow release fertilizer and come with one year warranty.
(Mulch) W Volusia Shed Pick Up (Thursday)
Install (2) yards of pine bark mulch to newly created bed around fire hydrant, mailbox, and pygmy date.
Equipment:
6.2L F250 (Eric)
Dovetail (Eric)
U-Dump (Ethan)
Mini-Skid (Ethan)
V10 (Ethan)
Augger
Irrigation Boxes
Dale Batten
Top Layer Pine Bark
Customer: Dale Batten (1692) Current Customer
Phone: (386) 801-0037
Address: 1555 stone road (DeLand, FL)
Crew:
(LF3) Ethan Yorio: Project Manager
(MF) Eric Moore
(CM2) David Gilliliand
(CM2) Maurice Simpson
SCOPE:
(Mulch)
Top dress all beds surrounding home and driveway with pine bark mulch
** We used 9yds last time and needed an additional 6 or so. I went with 10 because it should be layered lighter than before. If more or less mulch is needed the final invoice will reflect.
Pick Up Mulch From Volusia Mulch & Stone (10 Yd.)
Equipment:
Sure Trac with rails (Ethan)
V10 (Ethan)
Wheel Barrels
WVHS (Prep)
Delivery Acceptance/ Paver Base Pick Up
Customer: West Volusia Humane Society (1660) New Customer
Phone: (386) 747-1605
Address: 137 W Michigan Ave (DeLand, FL)
Crew:
(LF3) Ethan Yorio: Project Manager
(MF) Eric Moore
(CM2) David Gilliliand
(CM2) Maurice Simpson
(OM) Nathan Cabral - Irrigation
SCOPE:
(Delivery Acceptance)
Pavers Depot to deliver (3) Pallets of Crimson Tide “Red/Gray” 4x8 brick pavers to site and drop in RH field close to fence toward pop up drain for Silvano.
Expected Delivery 7-9 am Leave a man on site and send a driver to sanford.
McBride Enhancement crew to pick up 5 yd of Paver Base from Crush (Sanford) Location:
2365 Old Lake Mary Rd. (Sanford, FL)
Drop pile of paver base next to fence in open field using a tarp underneath to keep site clean.
Once the drop of paver base is completed then head to Dale Battens which is the other project loaded for today.
Equipment:
V10 with U Dump
Personnel on Site
Normandy (7 Brew)
7 Brew Coffee Shop Installation
PROJECT APPROVED (Sub Contractors)
We Are the Subcontractor on this site, please be curious/ mindful and uphold professionalism.
Customer: RNR Construction (1619) Returning Customer
Phone: Ed Kauffman (732) 674-4854
Address: 7788 Normandy Boulevard (Jacksonville, FL)
Crew:
(LF3) Ethan Yorio: Project Manager
(MF) Eric Moore
(CM2) David Gilliliand
(CM2) Maurice Simpson
SCOPE:
Notes:
Be professional at all times while working on construction site, any mishaps please report to Nathan no matter how minor.
(Irrigation) CIS
Install irrigation as indicated on landscape plan.
Duration: 3 days
(Plant install)
Install plants as indicated on Landscape plan
Material: $40,988.65
Duration: 5 days
(Mulch)
Install (35) yards of cypress / brown shredded mulch to all landscape beds
Duration: 1.5 days
Nathan to call Mulch Depot to schedule delivery once crew established Gameplan for days 1-3 on site.
Total (Mulch Depot): Delivered- $1,268.00
Equipment:
7.3L (Eric)
Dovetail (Eric)
Sure Trac with rails (Ethan)
Mini-Skid (Ethan)
Big Skid with bucket and fork attachments (Eric)
V10 (Ethan)
Laser Level
Augger
Irrigation Boxes
Lodging Information: Quality Inn & Suites (Jacksonville) Baymeadows
Address: 8333 Dix Ellis Trail (Jacksonville, FL)
Confirmation Number (Room 1): 717632574
Confirmation Number (Room 2): 717632570
Room Types: (2) Double Queen Beds
Check In: Monday April 01, 2024 (After 3:00 PM)
Check Out: Monday April 08, 2024 (Before 11:00 AM)
Hal Cobb (1696)
Property Clean Up and Paver Repairs
Customer: Hal Cobb (1696) New Customer
Phone: (386) 738-4218
Address: 282 Mar Vista Dr. (DeLand, FL)
Crew:
(MF) Eric Moore
(LF3) Ethan Yorio- Field Project Manager
(CM2) David Gilliand
(CM2) Maurice Simpson
SCOPE:
(Notes)
Bring saw to cut pavers around fence post.
(Cleanup)
Trim all azaleas on property to chest height
Remove (2) small camphor trees in north west corner of yard
limb up larger one to head height
Trim oak tree up to or right above the cable
De-vine and weed the azalea bushes
Cut back Ligustrum bushes to waist / belly height
Water Ligustrum's with super thrive organic fertilizer (ACE HARDWARE)
(Paver repair)
Repair sunken / unlevel pavers in (4) spots
Back right corner of home Where paver walkway connects to front porch.
Where paver walkway connects to steps
Gate to get into backyard
Re-sand all pavers with grey polymeric sand & install concrete edge
Pressure wash dirt & grime out of cracks of pavers
Equipment:
Super thrive organic fertilizer (ACE)
Pressure Washer
Ladders/ Extension ladder
V10/ U-Dump/ Mini Skid/ Rails
Chain Saw
Pole Saw
Concrete Saw
Paver Base (0.25 yd.)
Bag of Concrete
Wheel Barrells
Blower
Kay Naft (Repair/ TS)
Drainage Issues
Customer: Kay Naft (1649)
Phone: (253) 355-7738
Address: 1641 Bear Paw Lane (DeLand, FL)
Crew:
(MF) Eric Moore
(LF3) Ethan Yorio- Field Project Manager
(CM2) David Gilliand
(CM2) Maurice Simpson
SCOPE:
(Notes)
Kay Contacted Cam after last weeks rain storms notifying him that there are multiple issues with drainage that we had installed.
Cam will be able to meet on site between 10:50-11:30 am for a more in depth discussion on repairs and troubleshooting needed.
Picture below highlight the main issues with Kays Drainage system.
We can send a guy or two over in the morning while the others finish out plantings at WVHS to get a jump on digging up and exposing the issues present on Kays system.
YOU WILL NEED a bag of concrete and mini skid.
Pictures Below:
Equipment:
V10/ U-Dump/ Mini Skid/ Rails
Wheel Barrells
Blower
Shovels
WVHS
Plant Installs/ Pavers/ Irrigation
Customer: West Volusia Humane Society (1660) New Customer
Phone: (386) 747-1605
Address: 137 W Michigan Ave (DeLand, FL)
Crew:
(LF3) Ethan Yorio: Project Manager
(MF) Eric Moore
(CM2) David Gilliliand
(CM2) Maurice Simpson
(OM) Nathan Cabral - Irrigation
SCOPE:
(Plant install)
Purchase and install of all plants listed below
(10) 3 gallon dwarf fakatchie grass
(5) 3 gallon muhly grass
(5) 3 gallon cast iron plant
(2) 7 gallon lady palm
(3) 3 gallon Dwarf Walter viburnum
(7) 3 gallon Lime sizzler
(may need to substitute for another firebush depending on availability)
(3) 3 gallon Virginia sweet spire
(227) Qaurt size pollinator/butterfly flowers
(3) 3 gallon silver saw palmetto
(14) 3 gallon wild coffee little phsyco
(1) 3 gallon red fire spike
(11) 3 gallon azaleas
(1) 3 gallon Gardenia
(6) 3 gallon Florida anise
(63) Fern/shade mix
(3) 7 gallon camelia
(7) 3 gallon oakleaf hydrangea
(89) 3 gallon coontie
(111) Bromeliad mix
(3) 7 gallon Simpson stopper
(520) 1 gallon liriope
(330) Quart size mondo grass
(Pavers)
Install (380sf) of 4x8 pavers (4 pallets)
*Memorial patio is no longer in design, take sf of pavers and use for walkway up to north side of new porch. No color selected, client to inform on which color pavers preferred**
(Notes)
David recommended for the volunteers to obtain a temporary irrigation system with timer rather than hand water each plant. He is concerned that dragging the hose will cause more damage to the plants and improper watering could cause a decline in health. I expect a temporary irrigation system to run between $500-$1000 in material with hoses, timer, sprinklers etc.
Equipment:
7.3L (Eric)
U-Dump (Eric)
Sure Trac with rails (Ethan)
Mini-Skid (Ethan)
V10 (Ethan)
Laser Level
Augger
Irrigation Boxes
Camren McBride
Sod Demo and Installation/ Irrigation
PENDING APPROVAL
Customer: Camren McBride (TBD) Owner
Phone: (386) 216-6685 (Ext 1)
Address: 1401 West Winnemissett Avenue (DeLand, FL)
Crew:
(LF3) Ethan Yorio: Project Manager
(MF) Eric Moore
(CM2) David Gilliliand- Irrigation
(CM2) Maurice Simpson
SCOPE:
(Sod Install)
Install (9) pallets of Floratam sod where palmettos where cleared
(Delivery)
Schedule Delivery (Nathan) Friday Morning and or Thursday Night from Rick
(Irrigation)
Nathan to design system and run procurement
Nathan to install back flow siphon and valves with control box.
David and Maurice to install irrigation line work and heads in marked locations.
Equipment:
7.3L (Eric)
Sure Trac with rails (Ethan)
Mini-Skid (Ethan)
V10 (Ethan)
Irrigation Boxes
Rick Weeks
Sod Installation
PROJECT APPROVED
Customer: Rick Weeks (1683) Returning Customer
Phone: (785) 249-8544
Address: 1840 east parkway (DeLand, FL)
Crew:
(LF3) Ethan Yorio: Project Manager
(MF) Eric Moore
(CM2) David Gilliliand
(CM2) Maurice Simpson
SCOPE:
(Sod Install)
Prep Area for sod installation
Install (2.5) pallets of Bahia sod where palmettos where cleared
(Delivery)
Pickup / Delivery of sod from farm
(R&R) Call in Order in the morning
(Notes)*
If not already done, please add sand to pavers. Client noticed an area that needed more against the house.
Equipment:
7.3L (Eric)
Sure Trac with rails (Ethan)
Mini-Skid (Ethan)
V10 (Ethan)
U-Dump (Ethan)
Irrigation Boxes
Ethan & Nate
Site Meeting (WVHS)
Customer: West Volusia Humane Society New Customer
Phone: WVHS (386) 747-1605
Address: 137 W Michigan Ave (DeLand, FL)
Crew:
(LF3) Ethan Yorio: Project Manager
(OM) Nathan Cabral
TIME:
11:00 am-12:00 pm
SCOPE:
Meet with Camren, DeLand City Council and Silvano at project site for project overview and gameplan.
(Irrigation Inspection)
Nathan to perform irrigation inspection at Jennifer Dickinsons prior to meeting.
(Deer Island)
Nathan to perform irrigation inspection and site walk with cam at Tavars (Ken) project for review post WVHS meet up.
Equipment:
Ethan (V10 and or personal)
Nathan (F250)
Ben Flowers
Sod Demo and Installation (4.5 Pallets)
BRING PLYWOOD for all concrete areas skid will be operated on to prevent any marking and or Damage
This client is a Main Bank Manager that we would like to “WOW” and hopefully lead us to future commercial work within the local area. Please keep in mind while on site.
No Smoking/ Vaping on the premises for this project.
We are sub contracted through Pioneer Pest Services for this project.
PROJECT APPROVED
Customer: Ben Flowers (1669) New Customer
Phone: Ben Flowers (386)795-0172
Address: 1800 Mercers Hammock ct. (DeLand, FL)
Crew:
(LF3) Ethan Yorio: Project Manager
(MF) Eric Moore
(CM2) David Gilliliand
(CM2) Maurice Simpson
SCOPE:
Notes:
WOW the customer.
(Irrigation Inspection) COMPLETED
Perfrm irrigation inspection on zones 3 and 4 to inspect for adequate coverage to new sod area.
(Demo/ Removals)
BE CAUTIOUS while demoing, irrigation is run throughout both sides of this strip of turf removal.
Remove and grade out all disturbed turf areas on northern side of driveway (RH) and prep for new sod
Irrigation: Install (1) Rotor head off of zone 4 on exterior of turf zone to center section of driveway pad nearest garage. Picture sent to Ethan by Nathan
David to perform irrigation work below:
Tie into the zone 4 head closest to the halfway mark of driveway in picture sent to Ethan using a 1” to 1/2” T coupling and set head to 180 degree.
(1) 6” rotor head
15’ of SCH 40 1/2” line
(1) 1” T coupling 1” to 1/2”
(1) 1/2” to 3/4” FIPT connection
(2’) flex
(Sod Installation) ORDER PLACED FOR PICK UP- R&R Sod
Install 4.5 Pallets of Floratam St Augustine Sod within demo area.
Equipment:
7.3L (Eric)
Dovetail (Eric) Sod pick ups off desired.
Sure Trac (Ethan)
Big Skid with bucket and fork attachments (Eric)
V10 (Ethan)
Irrigation Boxes
Mini Skid with rails if decided by Ethan
Nathan Cabral (1680)
Property Cleanup for Sale of Home
Customer: Nathan Cabral (1680) New Customer
Phone: (774) 251-1436
Address: 312 West Ohio Avenue (Orange City, FL)
Crew:
(LF3) Ethan Yorio: Project Manager
(CM2) David Gilliand
SCOPE:
(Patio Prep) Ethan, Nate & David
Install 5 Yds. of Paver Base, Compact and Level on Back East Corner of Home, Nathan will be on site working with crew to perform site walk through. Paver base will elevate area roughly 2-4” compacted.
(Irrigation) Nathan
Install Irrigation line off of existing hose bib to NDS Valve box and install anti siphon valve for future use. (System is currently a 3/4” system)
(Dog Run Prep) Ethan & David
Demo/Grade and level area by Shed in back east corner of back yard and install landscape fabric within 75 degree shape for dog run area installing any additional paver base from patio area within this area.
(Haul)
Remove all items advised by Nathan within carport area for dump run to grand ave.
(Tree Cleanup)
Remove branches over hanging back yard tree house leaving main lead in tact.
(Drainage)
Install 1 Solid Drain roughly 10, off back gutter by new patio area to a pop up relief valve 4”
Equipment:
7.3 L/ Sure Trac
Laser Level
Ground Plate Compactor
Extension Ladder
Pole Saw/ Chainsaw
Wheel Barrells
Blower
Materials
Weed Fabric: 1 Roll (Shop)
Fabric Stakes: 50 ct. (Shop)
Downspout Adapter (Nathan to Supply)
Solid Line 4” Drainage (Shop) 10’
Pop Up Emitter (Nathan to Supply)
Carriage Homes
Property Cleanup for Sale of Home
Customer: Carriage Homes (HOA) Current Customer
Phone: Randy Bell: Maintenance (386) 837-0141
Address: Entire Community (DeLand, FL)
Crew:
(MF) Eric Moore: Project Lead
(CM2) Maurice Simpson
SCOPE:
Notes:
Camren to meet Eric and Maurice on site at 8:00 am to review game-plan, if Cam is not there once on site Crew is to begin de-weeding/ de-vining process throughout the Indian Hawthornes along the road way.
(Community Clean Up)
Trimming Up Community Oak Trees between homes
Pruning Small Plants within community
De-Weeding/ Vining bushes and plants around the community.
Equipment:
V10
U-Dump
Blower
Trash Barrels
Pole Saw/ Chainsaw
Hand Pruners (Laupers)
Blower
Barbara Davidson (1659)
Property Cleanup for Sale of Home
Customer: Barbara Davidson (1659) Current Customer
Phone: (386) 214-7226
Address: 1975 Fatio Rd. (DeLand, FL)
Crew:
(LF3) Ethan Yorio: Project Manager
(MF) Eric Moore
(CM2) David Gilliand
(CM2) Maurice Simpson
SCOPE:
(Cleanup)
Full property cleanup to prepare for home sale
(Front)
Remove large limbs / downed tree
Bush hog around trees on north side of driveway
Remove low growing tree blocking view from front of home
Remove cluster of vines growing around stump
Remove vines off of fence's separating front and backyards
(Around home)
Trim Myrtles
Remove oaks & unwanted bushes.
Trim hedge in front window
Trim fern off of wall 1.5 ft
Blow all leaves and clippings away from home
Remove appliances
(Backyard)
Remove playset
Trim all suckers on trees 10ft and below
Remove sticks/limbs
Remove vines from garden fence
String trim inside of garden area
(Full property) Last Day There
You will need lawn care open trailer with 52” mower and string equipment. Ask Luke to stop by and aid.
Standard lawn maintenance (mowing) to entire property to give it a finished look.
Equipment:
7.3 L/ Sure Trac
Pole Saw/ Hedge Trimmers
V10 Open Lawn Trailer with 52” Mower and String Trimmers/ Edgers
Wheel Barrells
Blower
Dennis Kletzing (1670)
Property Clean Up
Customer: Dennis Kletzing (1670) Current Customer “Daughters Home”
Phone: (386) 734-0386
Address: 705 North Ridgewood Ave (DeLand, FL)
Crew:
(LF3) Ethan Yorio: Project Manager
(MF) Eric Moore
(CM2) David Gilliand
(CM2) Maurice Simpson
SCOPE:
(Notes)
Mow on either side of driveway that goes down northern side of home
Bring extension ladder for palms and back trees, chainsaw for the bushes.
(Cleanup)
Move Trampoline into back pasture area using wide North End Gate.
Trim Viburnum hedges in front of home (cut down to mid window)
Trim Loropetalum bush
Trim trees away from roof in back fenced area
Remove (burn out and spray) weeds in beds
Trim palms in front yard
Full property maintenance (1x mow) Get with Luke to see if he will have a crew in the area to perform mowing tasks. If not load up a 52 on the Open trailer and utilize that for the day.
Equipment:
7.3 L/ Sure Trac
Pole Saw/ Hedge Trimmers
V10 Open Lawn Trailer with 52” Mower and String Trimmers/ Edgers
Wheel Barrells
Blower
Kay Naft (Phase 4)
Drainage Installation on Home Downspouts
Customer: Kay Naft (1649)
Phone: (253) 355-7738
Address: 1641 Bear Paw Lane (DeLand, FL)
Crew:
(MF) Eric Moore
(LF3) Ethan Yorio- Field Project Manager
(CM2) David Gilliand
(CM2) Maurice Simpson
SCOPE:
(Notes)
Drainage Trenches must be hand dug. Use extreme caution on both north and south sides of home for electrical and gas lines. Gas lines are painted out, electrical on south side is not.
(Drainage)
Tie into newly installed drainage from pool deck drain with 4” (T) connection.
Pool Drains Move South, dig next to downspout to find pipe, cut and angle towards the drainage we just installed and connect so that it flows into the live well.
(Paver Installation)
Install (300 sqft.) of Amaretto Pavers in 20x15’ area with next fence border tying into pool deck level. (Color Match to existing pavers)
Estimate is only for (2) Pallets at (248 sqft.) If more pavers are needed utilize pavers on site from previous projects if we need more that what is currently on site than we will have to purchase and pick up a new pallet to complete project.
Ensure concrete border is flush with new fence surrounding the area.
(Material)
(1) 4” T Connection
(2) Pallets of Amaretto Pavers
Drainage Pipe from the shop (Solid) for drainage connection.
(2) Concrete (80 lb.) Bags
(5) Tons of Paver Base
Equipment:
7.3 L/ Sure Trac
V10/ U-Dump
Wheel Barrells
Blower
Shovels
Current Site Plans have deviated from original site plans.
Michael O’Brien(1652)
Plant/ Mulch Installation
Customer: Michael O’Brien (1652) Sub Contracted
Phone:
Address: 3350 Timberlane Drive (DeLand, FL)
Crew (Enhancement Div):
(LF2) Ethan Yorio- Field Project Manager
(MF) Eric Moore- Master Foreman
(CM2) Maurice Simpson
(CM) David Gilliand
SCOPE:
(Plant install)
(2) 30 gal Japanese Blueberry
(1) 30 gal 'Yuletide' camelia (can get other colors at smaller gallon size)
(12) 3 gal Viburnum
(10) 3 gal Loropetulum
(14) 3 gal pink muhly
(4) 3 gal white pampas
(25) 1 gal Blue daze
(Sod) R&R Delivery to site (Monday)
Install (26.5) pallets of Florotam St. Augustine
(Irrigation) CIS Irrigation COMPLETED
(6-7) zone irrigation system installed to irrigate all new sod and plants. Timer to be installed exterior on the backside of home (near other utilities)
(Zone count will be indicated once a GPM measurement is taken, price to remain the same)
(Mulch)
Install (15) yards of brown shredded mulch within new bed areas.
(Notes)
All plants are to be installed with slow release fertilizer good for up to one year from install. - An irrigation inspection & adjustment will be completed by Nathan 30-60 Post Installation.
Equipment:
Dovetail & Big Skid for plant offloading and installation delivered to site Monday before procurement.
7.3L SureTrac (Enhancement Crew)
V10 with U Dump Trailer
2017 F250 (Irrigation Crew)
Augger
Backpack Blower
Irrigation Boxes
Gary Huttman (1640)
Plant/ Mulch Installation
Customer: Gary Huttman (1640)
Phone: (407) 538-4002
Address: 17 Tymber Cove (DeLand, FL)
Crew (Enhancement Div):
(LF2) Ethan Yorio- Field Project Manager
(MF) Eric Moore- Master Foreman
(CM2) Maurice Simpson
(CM) David Gilliand
Crew (Irrigation Div):
(OM) Nathan Cabral
SCOPE:
(Irrigation Div):
Full Irrigation Adjustment and Inspection Post Project to ensure plants are adequately covered.
(Enhancement Div):
(SCOPE)
Notes:
Nathan to meet with Ethan and crew on site for site walk and plant placement.
Drop off Dovetail and Big Skid to Job Site Monday morning before procurement, Then go back to shop and grab Sure Trac to go run procurement. Maurice and or David to stay on site with Eric and or Ethan to complete and touch up demo while (2) guys run procurement efforts.
BRING PLYWOOD so tracks of equipment don’t destroy sod within the yard.
(Mulch)
Install (8) yards of brown shredded mulch to beds against home
(Pine Straw Installation)
Install (15) bales of pine straw to (2) beds in center of yard (may need more, working off of estimate of Sf of 2 beds)
(Plant Install)
Install plants per design (quantities may differ from what is shown on design)
(4) 100 gallon Ligustrum trees (8-10ft ht)
(4) 30 gallon Japanese blueberry trees (Bush 8-10ft ht)
(40) 1 gallon Blue daze
(65) 1 gallon Variegated Liriope
(14) 7 gallon Sweet Viburnum
(12) 3 gallon Loropetelum
(50) 1 gallon Standard Liriope
Equipment:
Dovetail & Big Skid for plant offloading and installation delivered to site Monday before procurement.
7.3L SureTrac (Enhancement Crew)
V10 with U Dump Trailer
2017 F250 (Irrigation Crew)
Augger
Backpack Blower
Irrigation Boxes
Rick Weeks (1654)
Demo/ Paver Installation/ Palms/ Sod TBD
Customer: Rick Weeks (1654)
Phone: (785) 249-8544
Address: 1840 East Parkway (DeLand, FL)
Crew:
(LF) Ethan Yorio- Field Project Manager
(MF) Eric Moore- Master Foreman
(CM) Maurice Simpson
(CM) David Gillilian
SCOPE:
NOTES:
Do not damage pines or the root system (leave palmettos very close to pine if needed).
Be very easy on sod
Dead oak tree on northern side of driveway will need to be removed to fit machine into backyard without impeding on driveway.
Use plywood for areas where turning the machine
Plywood to be used to mitigate any damages to sod and extreme caution will be exercised to help assist in this matter.
There will be waste from our cuts when installing patio so the total sf will likely be closer to 220.
When doing removal of sod save any good pieces for any disturbed areas by machines. (Sod was recently installed)
No irrigation
(Land clearing)
Clear palmettos in back yard from property line to pine trees
Cut straight path down property line to back line for fence install
(Plant/ Mulch install)
Install (2) 7ft Sylvester palms (one in replacement of dead oak tree and second on south side of driveway in line with other)
Install 10 bags of pine bark mulch around base of palms
Save sod when removing bed for south side palm (use in disturbed areas - if any)
(Pavers)
Install (2) pallets or (248 sf) of Glacier pavers (10ft off of concrete porch and a few feet on either side of porch or as wide as able with the amount of blocks)
Install pavers in a T set Pattern (Tremron Oldtowne 3 set Glacier)
Equipment:
7.3 L/ Sure Trac
V10/ U-Dump
Wheel Barrells
Blower
Shovels
Sandy Gold (1655)
Removal of Weed/ Irrigation Inspection/ Mulch & Plant Install
Customer: Sandy Gold (1655)
Phone: (301) 631-5633
Address: 518 Walking Fern Loop (DeLand, FL)
Crew:
(LF) Ethan Yorio- Field Project Manager
(MF) Eric Moore- Master Foreman
(CM) Maurice Simpson
(CM) David Gillilian
(OM) Nathan C. (Irrigation)
SCOPE:
NOTE:
Before heading to site please install new canopy cover on Sure Trac, ensure the mini skid is greased and remove all debris and trash from the shop. Nathan to perform Irrigation inspection at 7:30 AM Monday morning before crew arrives on site and discuss repairs with customer to be performed while crew performs clean up.
(Irrigation) Monday Feb 26 @ 8:00 am
Full system inspection and report (Free for existing lawn customers) Any recommended repairs will be billed separately and sent for approval before commencement.
(Cleanup)
Remove "weeds" and unwanted plants/vines growing in any plants in all landscape areas on site (any weeds that can be dug out instead of cut out of plant will be dug out to prevent future growth)
Remove sticks/limbs that are dead in the wooded area on back of home
Remove any moss in plants
Trim variegated arbicola off of electrical components
Trim cabbage palm on corner of wooded area and remove weeds growing around it.
Remove dead tree in front yard (uproot/dig out for replacement)
Remove 2 dead azaleas
(Plant install)
Install (2) 3 gallon fashion azaleas.
Install (1) 30 gallon winged elm in place of dead tree in front yard
Install (10) 3 gallon loropetalum against home in bed where blue daze died off.
(Mulch)
Install (8) yards of cypress mulch (light top dress to all landscape beds)
Equipment:
7.3 L/ Sure Trac
V10/ U-Dump
Wheel Barrells
Blower
Shovels
Ralph Aiello (1650)
Drainage Demo/ Installation
Customer: Ralph Aiello (1650)
Phone: (407) 803-2148
Address: 521 South Pine Meadow Dr. (DeBary, FL)
Crew:
(LF2) Ethan Yorio- Field Project Manager
(MF) Eric Moore- Master Foreman
(CM2) Maurice Simpson
(CM) Davarius Keith
SCOPE:
(Drainage)
Break up concrete surrounding drain box currently responsible for pool drain.
Install (1) 9 inch nds drain box under pool deck drain (use pavers to box around the drain to ensure no rocks/dirt enter drain). Run 4 inch solid corrugated pipe from drain box and T into downspout piping.
Install (2) super gutter Ds adapters on both downspouts on the corner of home near pool equipment, run solid corrugated pipe underneath irrigation pipes (visible), use (2) 4 inch T's to tie into main line
Run 4 inch solid corrugated as main line to a pop up emitter next to downed tree stump
(Soil)
Install (2.5) yds of top soil over pipes where soil has been eroded around pool equipment.
(Material)
(1) Roll 4 inch SOLID corrugated
(1) 9 inch nds box
(1) pop up emitter
(2) Downspout adapters
(2) 4 inch T's
Equipment:
7.3 L/ Sure Trac
V10/ U-Dump
Wheel Barrells
Blower
Shovels
Gary Huttman
Pavers/ Drainage
Customer: Gary Huttman (1633)
Phone: (407) 538-4002
Address: 17 Tymber Cove (DeLand, FL)
Crew (Enhancement Div):
(LF2) Ethan Yorio- Field Project Manager
(MF) Eric Moore
(CM2) Maurice Simpson (Wed arriving on site at 11:00 am)
(CM) Davarius Keith
Crew (Irrigation Div):
(OM) Nathan Cabral
SCOPE:
(Irrigation Div):
Install complete new irrigation system in front yard of home including 3 zones.
Zone (1) to cover main lawn area in front lawn using gear driven rain bird rotor heads.
Zone (2) to cover interior of walkway and beds along front of home using rainbird spray heads.
Zone (3) to cover east/North side of driveway.
Irrigation Notes:
Nathan to visit site Monday Feb 12 for measurements and layout plan.
(3) 1.5 inch Hunter PGV valves with flow control.
(1) Rainbird ESP-ME smart controller with WIFI capabilities.
(1) Wireless Rain bird rain/freeze sensor to be installed
(Enhancement Div):
(Removal)
Remove all shrubs/plants and mulch in front beds, Crape myrtle, pygmy date and dead tree in front lawn.
(Drainage)
(Install underground drainage with pop up emitters at downspouts around home)
Front: (4 Ds) ran 20ft away from home to the south
Back (Pool drain and DS): Box drain installed and ran under sidewalk into bed with pop up emitter
Notes:
- This estimate is meant as a start to the process of design and install front landscape, once a budget is understood and customer preference on style and maintenance requirements is outlined I will begin the design and estimate for new plants/ground cover for the beds.
Equipment:
7.3L SureTrac (Enhancement Crew)
2017 F250 (Irrigation Crew)
Augger
Backpack Blower
Irrigation Boxes