Installation of Drainage and Sod at Swell
Customer: Sally Soderbloom
Address: 125 Sunset Point Dr. (Ormond Beach, FL)
Crew:
(LF) Eric Moore
(DM) Nathan Cabral
SCOPE:
Installation of downspouts to 4” lines from NE and NW gutters to sidewalk to 4” pop it valves.
Remove sod existing in swale where water is collecting and replace with 1 pallet of st aug
SCHEDULE:
Morning: Load 8-10 Pallets into the U-Dump along with Mini Skid
Pick up order from Site One in Orange City (PAID) I will stop by after dropping off lyla and see if i can fit site one supplies in my car and give you a call if i cannot.
Corrugated Pipe 4” (100 ft.)
Wye Connection 4”
Pop Up Relief Valve 4”
Pick Up Half Pallet (St. Augustine Floratam) from R&R will need to stack onto existing half pallet of sod since its already loaded in the UDUMP
Meet on site between 8:45 and 9:00
Equipment:
V10, Sure-Trac
Mini Skid
Irrigation Boxes
(2) Wheel Barrel
Backpack Blower
Pressure Washer