Sallys Drainage

 

Installation of Drainage and Sod at Swell

Customer: Sally Soderbloom

Address: 125 Sunset Point Dr. (Ormond Beach, FL)

Crew:

  • (LF) Eric Moore

  • (DM) Nathan Cabral

SCOPE:

  • Installation of downspouts to 4” lines from NE and NW gutters to sidewalk to 4” pop it valves.

  • Remove sod existing in swale where water is collecting and replace with 1 pallet of st aug

SCHEDULE:

  • Morning: Load 8-10 Pallets into the U-Dump along with Mini Skid

  • Pick up order from Site One in Orange City (PAID) I will stop by after dropping off lyla and see if i can fit site one supplies in my car and give you a call if i cannot.

    • Corrugated Pipe 4” (100 ft.)

    • Wye Connection 4”

    • Pop Up Relief Valve 4”

  • Pick Up Half Pallet (St. Augustine Floratam) from R&R will need to stack onto existing half pallet of sod since its already loaded in the UDUMP

  • Meet on site between 8:45 and 9:00

Equipment:

  • V10, Sure-Trac

  • Mini Skid

  • Irrigation Boxes

  • (2) Wheel Barrel

  • Backpack Blower

  • Pressure Washer