Plant/ Mulch Installation
Customer: Gary Huttman (1640)
Phone: (407) 538-4002
Address: 17 Tymber Cove (DeLand, FL)
Crew (Enhancement Div):
(LF2) Ethan Yorio- Field Project Manager
(MF) Eric Moore- Master Foreman
(CM2) Maurice Simpson
(CM) David Gilliand
Crew (Irrigation Div):
(OM) Nathan Cabral
SCOPE:
(Irrigation Div):
Full Irrigation Adjustment and Inspection Post Project to ensure plants are adequately covered.
(Enhancement Div):
(SCOPE)
Notes:
Nathan to meet with Ethan and crew on site for site walk and plant placement.
Drop off Dovetail and Big Skid to Job Site Monday morning before procurement, Then go back to shop and grab Sure Trac to go run procurement. Maurice and or David to stay on site with Eric and or Ethan to complete and touch up demo while (2) guys run procurement efforts.
BRING PLYWOOD so tracks of equipment don’t destroy sod within the yard.
(Mulch)
Install (8) yards of brown shredded mulch to beds against home
(Pine Straw Installation)
Install (15) bales of pine straw to (2) beds in center of yard (may need more, working off of estimate of Sf of 2 beds)
(Plant Install)
Install plants per design (quantities may differ from what is shown on design)
(4) 100 gallon Ligustrum trees (8-10ft ht)
(4) 30 gallon Japanese blueberry trees (Bush 8-10ft ht)
(40) 1 gallon Blue daze
(65) 1 gallon Variegated Liriope
(14) 7 gallon Sweet Viburnum
(12) 3 gallon Loropetelum
(50) 1 gallon Standard Liriope
Equipment:
Dovetail & Big Skid for plant offloading and installation delivered to site Monday before procurement.
7.3L SureTrac (Enhancement Crew)
V10 with U Dump Trailer
2017 F250 (Irrigation Crew)
Augger
Backpack Blower
Irrigation Boxes